Highway misery in pre-monsoon: Fate repeating itself
As events in Global accelerate, the focus remains on pre-monsoon highway woes: repeating fate, bringing clearer perspective to the multifaceted nature of these recent reports.
20 Baisakh, Chitwan. The Narayangadh-Muglin road section, which was affected by the landslide, has been fully operational. Due to the rain, the traffic was affected due to landslides at two places this morning. The road was blocked in the morning when a landslide with stones fell in the Tuin River and Panidhara of that road section. After the landslide occurred at 5:45 am, the road in Tuinkhola was operated in one direction only. According to police inspector Prateek Singh of the area police office, Muglin, the road is now fully operational. He said that the road has been opened in both directions by ordering a dozer from Bharatpur. The landslide in Panidhar was removed in the morning.
Comments
0 contributions
Join the discussion and share your perspective.
Retrieving feed...




